The scope of CCC certification for motor vehicles shall be in accordance with the requirements of the Implementing Rules for vehicles of category M, N and O (including complete vehicles and non-integrated vehicles). The certification according to the general safety standards eg GB 7258 "technical requirements for the safe operation of motor vehicles", For specific product inspection articles, please refer to the implementation rules of CNCA-C11-01: 2014 Automotive Annex 1 Type Test Projects and Standards.

1, How long does it take from the application to the receipt of the certificate?

90 days are set by law for cetification. According to experience, these sometimes take longer.

* it could result in a delay in processing:

if application documents are not complete,

if there are problems with testing in the Test Lab,

if there is a deviation in the audit.

Source: CCAP-C11-01: 2014 / A1 page 4, item 6.2

2, How often does factory audit take place?

Plant is classified after the initial audit in A, B, C, D.

A: Factory audit takes place once every 2 years.

B or C: Factory audit takes place once a year.

D: Factory audit takes place at least twice a year.

Source: CCAP-C11-01: 2014 / A1 Page 2, Point 4.2, CCAP-C11-01: 2014 / A1 Page 13, Point 10.2

3, how many audit days are there at the Inital Audit or the FU Audit?

Initial Audit: up to 10 man day per model series, depending of subparts certified

FI audit: up to 6 man day per model series

Source: CCAP-C11-01: 2014 / A1 page 9, clause 9.2.1.2,

CCAP-C11-01: 2014 / A1 page 14, item 10.3.2

4, how is the audit conducted?

Factory audit is performed according to IR CNCA-C11-01 Appendix 5

- Responsibility of quality manager: Appointment letter and service description (creation of control documents, management of change, complaint, CCC mark, CCC certificate status, etc.)

-Technical documentation: management of technical documents, control plan, product standard, product description of existing / new products, etc.

-Overview control: control of property, model and supplier of core material and core components, etc.

- Checking product compliance: running tests, final tests, etc.

Review of production process compliance: review of product structure, material and component, conformity of core production process, etc.

Product Check: Requalification Test

Change control: control of change request, etc.

Control of serious quality problems: customer complaint, recall, etc.

Source: IR CNCA-C11-01 Appendix 5

5, which application documents should be submitted to the initial audit?

  1. Application form
  2. License in copy-แบบสอบถาม ประกอบด้วย ข้อมูลโดยย่อเกี่ยวกับบริษัท กระบวนการผลิต รายชื่อโรงงานการผลิตหลัก รายชื่อเครื่องมือทดสอบหลัก หลักฐานเครื่องหมายการค้าจดทะเบียน ฯลฯ
  3. Car structure and technical parameters
  4. COP control plan
  5. Declaration: how is type, series defined
  6. Declaration: how is VIN defined
  7. Explanation: we distinguish the different types by external marking
  8. Declaration: Operating instructions in Chinese
  9. COC certificate
  10. Review
  11. Quality Manual
  12. Quality system certificates in copy
  13. Etc.

Source: CCAP-C11-01: 2014 / A1 Page 22-23 Appendix 1

6, how is Unit (technical unit) defined?

Step 1: Group car first after series defined by manufacturer

Step 2: Units are removed from the same series

It can not be defined as a unit if:

- Car types are not the same (M1 - up to 9 seater, M2 - from 10 seats, M3, N1, N2, N3, O1, O2, O3, O4), see below 8.1.1, 8.1.2, 8.1.3.

- car series is not equal

- position of the engine is not equal (front, middle, rear)

- fuel is not equal (gasoline, diesel, gas, electricity, etc. Hybrid "gasoline + electric" is considered as same unit as gasoline engine, hybrid "diesel + electric" is considered as same unit as diesel engine)

- Drive is not equal (four-wheel, non-four-wheel)

- Sum of the axis is not equal

- Etc.

Within one unit:

- Vehicle outside dimension limit: 20%, longest <= shortest x 1.2

- Limit axle position, wheelbase: 15%, longest <= shortest x 1.15

- Limit parameters (total weight, distribution of front and rear axle): 20%

- Etc.

6.1 M1

Same design platform, structure from part before B pillar similar (sedan, station wagon, convertible with hardtop, convertible with folding roof, etc.)

Limit within one unit: Engine KW: 30%, Displacement: 20%

6.2 M2, M3, N1, N2, N3

Limit value for engine KW: 50%, engine capacity: 50%

Limit within one unit: total weight: 20%

Source: IR CNCA-C11-01 Appendix 2

7. Which tests are performed according to which GB standard?

See CCAP-C11-01: 2014 / A1 page 29-45

8, List of key component and materials:

See CCAP-C11-01: 2014 / A1 page 22-23 Appendix 1 page 24-27

ข่าวซีซีซี

ออกข้อบังคับการบังคับใช้ CNCA-C11-01 ใหม่สำหรับยานพาหนะแล้ว ออกข้อบังคับการบังคับใช้ CNCA-C11-01 ใหม่สำหรับยานพาหนะแล้ว 04-25-2020 -  เมื่อวันที่ 17 เมษายน 2020 มีการออกกฎกระทรวงบังคับใช้ใหม่...
อัปเดตขอบเขตธุรกิจของหน่วยงานรับรอง CCC ของจีน อัปเดตขอบเขตธุรกิจของหน่วยงานรับรอง CCC ของจีน 09-14-2019 -  CNCA เปิดตัวหน่วยงานรับรอง ccc ของจีนสำหรับการป้องกันการระเบิด
มาตรฐาน GB ของจีนใหม่ 10 รายการเปิดตัวแล้ว มาตรฐาน GB ของจีนใหม่ 10 รายการเปิดตัวแล้ว 08-16-2019 - ตามที่สำนักข่าวซินหัวรายงานเมื่อเร็วๆ นี้จากคณะรัฐมนตรีแห่งสาธารณรัฐประชาชนจีน...
ผลิตภัณฑ์ป้องกันการระเบิด CCC ที่เกี่ยวข้อง ผลิตภัณฑ์ป้องกันการระเบิด CCC ที่เกี่ยวข้อง 07-17-2019 - ตามประกาศล่าสุดของ CNCA การป้องกันการระเบิด...
มาตรฐาน GB ใหม่และแก้ไข 374 รายการได้รับการเผยแพร่ มาตรฐาน GB ใหม่และแก้ไข 374 รายการได้รับการเผยแพร่ 07-09-2019 - ตามที่สำนักข่าวซินหัวรายงานเมื่อเร็วๆ นี้จากคณะรัฐมนตรีแห่งสาธารณรัฐประชาชนจีน...
มาตรฐาน GB ใหม่และแก้ไข 173 รายการได้รับการเผยแพร่ มาตรฐาน GB ใหม่และแก้ไข 173 รายการได้รับการเผยแพร่ 06-16-2019 - ตามที่สำนักข่าวซินหัวรายงานเมื่อเร็วๆ นี้จากคณะรัฐมนตรีแห่งสาธารณรัฐประชาชนจีน...
Geely ตั้งศูนย์วิจัยและพัฒนาทางวิศวกรรมในประเทศเยอรมนี Geely ตั้งศูนย์วิจัยและพัฒนาทางวิศวกรรมในประเทศเยอรมนี 05-18-2019 - ตามรายงานของสำนักข่าว China News Service กรุงปักกิ่ง เมื่อวันที่ 16 พฤษภาคม ว่า...
อัปเดตขอบเขตธุรกิจของห้องปฏิบัติการทดสอบสำหรับผลิตภัณฑ์ CCC ของจีน อัปเดตขอบเขตธุรกิจของห้องปฏิบัติการทดสอบสำหรับผลิตภัณฑ์ CCC ของจีน 04-29-2019 - ขอบเขตทางธุรกิจของห้องปฏิบัติการทดสอบที่ได้รับการคัดเลือกสำหรับ China CCC...

Support

Unterstützung

คุณทำงานตามจังหวะของคุณ คุณสามารถจัดการโครงการของคุณได้อย่างอิสระผ่านพอร์ทัลของเรา รวมถึงสอบถามเกี่ยวกับการสนับสนุนส่วนบุคคล ดังนั้นเราจึงมุ่งมั่นที่จะให้โอกาสคุณในการออกแบบกระบวนการของคุณเองโดยไม่ต้องสละการสนับสนุนผ่านพอร์ทัลของเรา

การบริหารจัดการออนไลน์

การแปลออนไลน์

เราเปิดโอกาสให้คุณดำเนินกระบวนการรับรองด้วยตัวเอง แต่ไม่ต้องละทิ้งความรู้ความสามารถหรือการสนับสนุนจากพนักงานที่มีประสบการณ์ ระบบออนไลน์ได้รับการออกแบบมาเพื่อการรับรองที่หลากหลาย และยังมีรายการคำถามที่พบบ่อย แบบฟอร์มและตารางสำเร็จรูป และโมดูลสำหรับชี้แจงคำถามที่ยังไม่ได้รับคำตอบจากพนักงานของเรา

การเปลี่ยนแปลงใบรับรอง

การเปลี่ยนแปลงใบรับรอง

ในยุคสมัยที่เปลี่ยนแปลงอย่างรวดเร็วนี้ การเปลี่ยนแปลงในชีวิตทางธุรกิจเป็นสิ่งที่มาคู่กันเสมอ โครงสร้างถาวรที่เคยสร้างขึ้นมาหลายปีอาจพังทลายลงได้อย่างรวดเร็ว สาเหตุทั้งภายในและภายนอกทำให้สิ่งนี้เกิดขึ้น ฝ่ายบริการลูกค้าจะให้ภาพรวมของความสอดคล้องระหว่างการเปลี่ยนแปลง

ความร่วมมือ

ความร่วมมือ

เนื่องจากเราทุกคนมีเวลาและกำลังทางการเงินที่จำกัด และต้องการมอบบริการที่ครอบคลุมให้กับลูกค้า ความร่วมมือจึงสมเหตุสมผลเฉพาะระหว่างองค์กรที่เกี่ยวข้องเท่านั้น องค์กรเหล่านี้มีโครงสร้างที่เชื่อถือได้ รวมถึงความสามัคคีระหว่างบุคคลที่ดี

ไปที่ด้านบน